Penetrant Testing (PT) Unit
PT Unit is indispensable for continuous penetrant testing of parts in a production line of parts factory.The PT Unit is generally composed of multiple baths, washing booth, drying room and inspection room.
PT Unit List
Penetrant Testing (PT) Material
MARKTEC has two types of Penetrant; visible dye penetrant (red color) and fluorescent penetrant, and three types of Developer; dry powder type, aqueous type and nonaqueous quick drying aerosol type. Cleaner/Remover is used for pre-cleaning of workpiece, removal of excess penetrant and post-cleaning of workpiece.
PT Material List
Principle of PT
Penetrant Testing process is usually "Pre-cleaning - Penetrating - Washing - Developing - Observation - Post-cleaning" .